Pevensey Castle Conservation Works - PAYE Stonework & Restoration
2112
post-template-default,single,single-post,postid-2112,single-format-standard,ajax_fade,page_not_loaded,,qode_grid_1400,footer_responsive_adv,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-17.2,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-5.6,vc_responsive
 

Pevensey Castle Conservation Works

Pevensey Castle Conservation Works

PAYE have a proud history of working on some of our most historic castles and structures.

Take a look at our video detailing our work at Pevensey Castle for English Heritage which has featured heavily in the local news agenda, on both ITV Meridian and BBC South East.

A multi-phase project to avoid the colder temperatures, Phase I concentrated on the Roman boundary walls last year and Phase II (this year) focused on the Medieval Bailey.

Vegetation had taken a stronghold around the ruin and in places deep root systems penetrated the masonry threatening to cause irreversible damage. This project then required a cautious approach to repair using injection grouting, lime mortar consolidation and localised re-bedding and repointing of the stone.